Filter by:

Status
Embrapa Units
 

The general objective of this project was to identify microbial strains that produce enzymes capable of degrading fibers or hydrolyzing secondary anti-nutritional compounds, aiming to identify microbial isolates (rumen bacteria or fungi) with fibrolytic capacity or tolerant to anti-nutritional factors, as well as to expeditiously isolate and characterize fibrolytic enzymes. It was also the objective of this project that the use of laboratory procedures would serve to train undergraduate and grad

Status: Completed     Start date: Fri Aug 01 00:00:00 GMT-03:00 2008

Spittlebug, Mahanarva spectabilis (Hemiptera: Cercopidae) is capable to cause drastic losses in production and quality of pastures established with grasses. Currently, the use a grass resistant cultivar, to be obtained by means of constitutive antibiosis, is the best spittlebug controlling method. However, the time required for releasing a cultivar after detecting a spittlebug-resistant strain is relatively long. Allied to this, one should take into consideration that the adaptations of

Status: Completed     Start date: Mon Jun 01 00:00:00 GMT-03:00 2015

Silvopastoral systems may be an option to prevent grassland degradation because of the potential to control erosion and the ability of some tree species to add nitrogen and other nutrients to pasture, improving soil fertility. In view of this potential, in-depth evaluations of the soil and plant components of these systems are critical. The objective of this project was to verify the effect of trees on soil quality (fertility, biomass and microbial activity) and to evaluate the dry matter produc

Status: Completed     Start date: Thu Mar 01 00:00:00 GMT-03:00 2007

The goal is to assess the economic and ecological effectiveness of different models of forest restoration of degraded areas through the induction of secondary ecological succession, by natural regeneration, planting of seedlings, and the direct sowing of native and exotic tree species to compose the Legal Reserve.

Status: Completed     Start date: Sat Oct 01 00:00:00 GMT-03:00 2011